Scope of content - UK - CAWS (Small Works)
Libraries of pre-written specification clauses, guidance and manufacturer product information are written by our multi-disciplinary specialist team.
NBS Chorus covers multi-discipline content, which means that an accurate specification can be written in less time, avoiding the risk of duplicated or conflicting content.
Download full list of preliminaries content groupings by library (PDF)
Preliminaries
Infrastructure Conditions of Contract (ICC) Minor Works Version |
JCT 2016 Framework Agreement |
JCT 2016 Minor Works Building Contract |
JCT 2016 Minor Works Building Contract with Contractor's Design |
NEC3 Engineering and Construction Contract (ECC) Short Contract |
NEC4 Engineering and Construction Contract (ECC) Short Contract |
RIAI SF88 |
RIBA Concise Building Contract |
SBCC 2014 Framework Agreement |
SBCC 2016 Minor Works Building Contract |
SBCC 2016 Minor Works Building Contract with Contractor's Design |
Short Public Works Contract |
Work sections
Download full list of content groupings by library (PDF)
B - Complete buildings/ structures/ units |
C - Demolition/ alteration/ renovation |
D - Groundwork |
E - In situ concrete/large precast concrete |
F - Masonry |
G - Structural/carcassing metal/timber |
H - Cladding/covering |
J - Waterproofing |
K - Linings/sheathing/dry partitioning |
L - Windows/ doors/ stairs |
M - Surface finishes |
N - Furniture/equipment |
P - Building fabric sundries |
Q - Paving/planting/fencing/site furniture |
R - Disposal systems |
S - Piped supply systems |
T - Mechanical heating/cooling/refrigeration systems |
U - Ventilation/air conditioning systems |
V - Electrical supply/power/lighting systems |
W - Communications/security/control systems |
X - Transport systems |
Z - Building fabric reference specification |