17 July 2011
by

The role of render as both an aesthetic waterproofing and a strength-giving material is discussed; including experimental evidence from the BRE.

As well as explaining other key considerations, the programme compares the cost of building a typical three-bedroom straw bale house, to that of building using traditional materials. Barbara explains why the two are currently level-pegging, and why cost isn't necessarily the driving factor when it comes to building with straw.

About the contributors

Barbara Jones is founder and director of straw bale design, construction and training company Amazonails. She was named Woman of Outstanding Achievement 2009 by the UK Resource Centre for Women in Science, Engineering and Technology (UKRC).

Paul Spittlehouse of Taylor Pearson Construction is the site manager of the Waddington scheme. Experienced in traditional building methods, it is the first time Paul has built with straw; an experience that he said he had thoroughly enjoyed.

Mick Gadd is North Kesteven District Council's property services manager. A qualified building surveyor, Mick is in charge of the maintenance of the Council's 3,800 strong housing stock, as well as new-build schemes including the Waddington development.



Disclaimer: RIBA CPDNBS TV programmes are the intellectual property of RIBA Enterprises and it shall be a breach of this right to copy, or in any way exploit commercially or show in public any of the programmes without the express permission of RIBA Enterprises. The information contained in the programmes is not intended and accordingly shall not be relied upon either as a substitute for professional advice or judgement or to provide legal or other advice with respect to any particular circumstance. RIBA Enterprises accepts no responsibility for loss occasioned to any person acting or refraining from action as a result of the information contained in the programmes.  

Related reading

The NBS guide to straw bale construction