Click here to find out how to access this document
Information Paper 3/88 Production drawings - arrangement and content
Publication Year
1988
Document Status
Current
Abstract
Reports on new findings which emerged during work in support of the Co-ordinating Committee for Project Information Drawings Working Group, with regard to a Code of Procedure for production drawings. Concludes that a flexible approach is needed to the arrangement of drawings and three basic approaches are suggested depending on the characteristics of the project.
Document History
This document is no longer available from the original publisher, therefore the status is unconfirmed.
Author
Crawshaw, D. T. and Snook, K.
Publisher Information
BRE
BRE is a building science centre that generates new knowledge through research. This is used to create products, tools and standards that drive positive change across the built environment. BRE helps its government and private sector clients meet the significant environmental, social and economic challenges they face in delivering homes, buildings and communities. BRE is owned by the BRE Trust, a registered charity. The Trust uses the profits made by the BRE companies to fund research and education that advances knowledge of the built environment.
IHS BRE Press
The Capitol Building
Bracknell
BRE
UK