Other tools NBS offers a range of tools for specification and collaboration National BIM Library The most trusted BIM Library in the UK, certified to the internationally-recognised NBS BIM Object Standard Uniclass 2015 A dynamic and unified classification system for the construction industry covering all sectors Construction Information Service (CIS) A comprehensive online collection of construction related standards, regulations, technical advice and articles Plug-ins NBS provides a range of tools to help connect your CAD model to your specification model
Platform Resources Support Events About TheNBS.com Manufacturers Uniclass 2015 Get in touch

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom
Download from CIS *
* A valid subscription to The Construction Information Service is required to download this document.

Click here to find out how to access this document

Digest 329 Installing wall ties in existing construction

Publication Year

2000

Document Status

Current

Abstract

Techniques have been developed since the 1970s for the reinstatement of cavity walls by inserting new wall ties without recourse to demolition and reconstruction. This digest describes the range of techniques and the associated hardware that are available. It deals particularly with cavity walls that either have been damaged or have lost their connection between the leaves as a result of the corrosion of steel wall ties. The methods described are also applicable to a range of related situations where ties are to be inserted; for example, tying back new walls to cross walls, repairing subsidence damage, stabilising collar jointed* and faced walls, tying back cladding walls to frame structures and tying back walls that have been cut for openings or movement joints. *Collar jointed walls: two parallel single-leaf walls, with a space between not exceeding 25mm, filled solidly with mortar and so tied together as to result in common action under load.

Document History

Replaces - BRE Digest 257.

Author

de Vekey, R. C.

ISBN

9781860814051

Publisher Information

BRE

BRE is a building science centre that generates new knowledge through research. This is used to create products, tools and standards that drive positive change across the built environment. BRE helps its government and private sector clients meet the significant environmental, social and economic challenges they face in delivering homes, buildings and communities. BRE is owned by the BRE Trust, a registered charity. The Trust uses the profits made by the BRE companies to fund research and education that advances knowledge of the built environment.