Interim Advice Notes 25 Measures to minimise the risk of sulphate attack (including thaumasite) - New construction and structures under construction
Publication Year
1999
Document Status
Withdrawn
Abstract
Includes measures to minimise the risk of all forms of sulfate attack (including thaumasite), and applies to all new buried concrete. It supersedes IAN 15 which was published to provide details of the actions that were required to be taken by designers to deal with the potential effects of the thaumasite form of sulfate attack in new construction buried concrete.
Document History
Interim Advice Notes (IANs) are issued by the Highways Agency from time to time. They contain specific Guidance, which shall only be used in connection with works on motorways and trunk roads in England, subject to any specific implementation instructions contained within an IAN. Whilst IANs must be read in conjunction with the Design Manual for Roads and Bridges (DMRB) and Manual of Contract Documents for Highway Works (MCHW) for the above works, and may incorporate amendments or additions to documents in these manuals, they are not part of the DMRB or MCHW. Refers to DMRB Volume 2 Section 2 (2.2). Supersedes IAN 15. Superseded by IAN 48/03.
Publisher Information
Highways Agency
The Highways Agency is now known as Highways England. The new government company is in charge of operating England's motorways and major A roads, including modernising and maintaining the highways. Their publications include the Design Manual for Roads and Bridges, the Manual of Contract Documents for Road Works and Interim Advice Notes.
Publications available from:
The Stationery Office Ltd
PO Box 276
Nine Elms Lane
London
HA
UK
Website: https://www.gov.uk/government/organisations/highways-england
Email: info@highwaysengland.co.uk
Tel: 0333 202 5070