Click here to find out how to access this document
Information Paper 16/01 Part 1 Prefabricated housing in the UK: a case study - Murray Grove, Hackney
Publication Year
2001
Document Status
Archived
Abstract
Describes two case studies. Summarises the project. The main objective was to study modular construction in the context of flexible, adaptable and sustainable solutions to the changing demands of social housing. This case study is the Peabody Trust’s Murray Grove in Hackney. The architects were Cartwright-Pickard, the manufacturer was Yorkon and the main contractor was Kajima. The development was completed in November 1999.
Document History
Whilst this publication can still be purchased some of the information in it has been superseded by more recent research and standards. The BRE Group does not accept any responsibility whatsoever for any loss or damage, including - without limitation - indirect or consequential loss or damage arising from use, or loss of use, of data or profits arising out of, or in connection with, the use of this document.
Author
Bagenholm, C. Yates, A. and McAllister, I.
ISBN
9781860814952
Publisher Information
BRE
BRE is a building science centre that generates new knowledge through research. This is used to create products, tools and standards that drive positive change across the built environment. BRE helps its government and private sector clients meet the significant environmental, social and economic challenges they face in delivering homes, buildings and communities. BRE is owned by the BRE Trust, a registered charity. The Trust uses the profits made by the BRE companies to fund research and education that advances knowledge of the built environment.
IHS BRE Press
The Capitol Building
Bracknell
BRE
UK