Definition of prime cost of daywork carried out under a heating, ventilating, air conditioning, refrigeration, pipework and /or domestic engineering contract. 2nd edition
Publication Year
1980
Document Status
Withdrawn
Abstract
Details the composition of total charges including labour, materials and goods, plant, and incidental costs, overheads and profit.
Document History
Joint publication with the Heating and Ventilating Contractors' Association.
Publisher Information
Royal Institution of Chartered Surveyors
The Royal Institution of Chartered Surveyors is the global professional body promoting and enforcing international standards in the valuation, management and development of land, real estate, construction and infrastructure. In 2001, the Institute of Building Control merged with RICS; followed by the Incorporated Society of Valuers and Auctioneers, which merged with RICS in 2006.
12 Great George Street
Parliament Square
London
RICS
UK
Website: https://www.rics.org/uk/
Email: contactrics@rics.org
Tel: +44 (0)24 7686 8555