Contract for home repairs and maintenance
Publication Year
2002
Document Status
Withdrawn
Abstract
A contract for work that is basically non-structural and not likely to involve more than one trade. Covers work that is unlikely to take a great deal of time, perhaps a day or less in some cases, or up to 2 to 3 weeks in others. Contains both contractor and customer copies of the contract.
Publisher Information
Joint Contracts Tribunal
JCT contract documents have been published by Sweet and Maxwell (SMA) since 2005. Established in 1931, the Joint Contracts Tribunal produce standard forms of contracts, guidance notes and other standard documentation for use in the construction industry.
28 Ely Place
London
JCT
UK
Tel: +44 (0)20 7251 7100