Click here to find out how to access this document
Report R 85C Target and cost-reimbursable construction contracts - Part C: Preparation of contract conditions (relating to the ICE conditions - 5th edition)
Publication Year
1982
Document Status
Current
Abstract
A study of the use of target and cost-reimbursable contracts giving advantages and disadvantages. Part C examines the considerations of preparing contracts and looks at the clauses for actual cost and fee.
Document History
Formerly report 56, R 85 is split into 3 parts A-C.
Publisher Information
CIRIA
CIRIA was formerly known as the Construction Industry Research and Information Association. They are a member-based research and information organisation who publish reports and technical papers covering building and civil engineering as well as transport and utilities infrastructure.
124 City Road
London
CIRIA
UK
Website: http://www.ciria.org
Email: enquiries@ciria.org