Safety, Health and Welfare (Construction) Regulations 2006 F1:2007 Invitation to tender - main contractor
Publication Year
2007
Document Status
Withdrawn
Abstract
An advice note to the project supervisor design stage and to the job architect on what information should be sought from the main contractor at tender stage. Part of the RIAI Preliminary health and safety plan pack.
Document History
Superseded by SHW13 F:2017 Client report: pre-qualification of contractors for project architect. This document is part of the RIAI Preliminary health and safety plan pack, a required set for the project supervisor to administer their duties under the Safety, health and welfare (construction) regulations 2006.
Publisher Information
Royal Institute of the Architects of Ireland
The RIAI is the regulatory and support body for Architects in Ireland. They are committed to upholding the highest standards in architecture and providing impartial and authoritative advice and information in issues affecting architects, the built environment and society.
8 Merrion Square
Dublin 2
RIAI
Ireland
Website: https://www.riai.ie/
Email: info@riai.ie
Tel: +353 (0)1 676 1703