JCT Management Building Contract (MC) MC JCT management building contract (includes correction slip issued February 2008)
Publication Year
2008
Document Status
Withdrawn
Abstract
Appropriate for large-scale projects requiring an early start onsite, where the works are designed by or on behalf of the employer but where it is not possible to prepare full design information before the works commence and where much of the detail design may be of a sophisticated or innovative nature requiring specialists. Also applies where the employer is to provide the management contractor with drawings and a specification, and where a management contractor is to administer the conditions.
Document History
JCT 2005 Contracts should not be used for construction contracts entered into after 1 October 2011. Includes Terrorism Cover Update, issued December 2009.
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000