Click here to find out how to access this document
Cost model study - school buildings. A comparative cost assessment of the construction of a typical secondary school
Publication Year
2008
Document Status
Current
Abstract
A comparison of various structural frame options for two/three storey secondary school buildings on brownfield sites in urban locations with particular emphasis on cost. Identical specifications were required in the case studies, with the only variations being directly attributable to the material used in the structural frame.
Document History
Document reference: CCIP-011.
ISBN
1904818601
Publisher Information
The Concrete Centre
The Concrete Centre is the central development organisation for the UK concrete sector and provides material, design and construction guidance. Their aim is to enable all those involved in the design, use and performance of concrete to realise the potential of the material. Funded by 15 major cement and concrete organisations, the Concrete Centre works alongside the British Cement Association, The Concrete Society, and the ready mix and precast concrete industries to ensure an integrated approach from the concrete sector to technical support, research, education, training and information services. The Reinforced Concrete Council and the Ready Mixed Concrete Bureau are now part of The Concrete Centre.
1st Floor
297 Euston Road
London
TCC
UK
Website: www.concretecentre.com
Email: info@concretecentre.com
Tel: 020 7963 8000