Interim Advice Notes 117/08 rev1 Certification of combined kerb and drainage products. Revision 1 June 2009
Publication Year
2008
Document Status
Withdrawn
Abstract
To ensure combined kerb and roadside drainage units installed on HA roads fully comply with the requirements of HA and BSI standards. Provides guidance and clarifies the requirements including product certification, application, actions and implementation.
Document History
Interim Advice Notes (IANs) are issued by the Highways Agency from time to time. They contain specific Guidance, which shall only be used in connection with works on motorways and trunk roads in England, subject to any specific implementation instructions contained within an IAN. Whilst IANs must be read in conjunction with the Design Manual for Roads and Bridges (DMRB) and Manual of Contract Documents for Highway Works (MCHW) for the above works, and may incorporate amendments or additions to documents in these manuals, they are not part of the DMRB or MCHW. Revision 1 issued June 2009 - changes include information on CE Marking and acceptance by the Highways Agency of a transitional period of grace to allow manufacturers to continue to revise their certification procedures to comply with clarified requirements. Further revision of this IAN will occur announcing the final transition end date.
Publisher Information
Highways Agency
The Highways Agency is now known as Highways England. The new government company is in charge of operating England's motorways and major A roads, including modernising and maintaining the highways. Their publications include the Design Manual for Roads and Bridges, the Manual of Contract Documents for Road Works and Interim Advice Notes.
Publications available from:
The Stationery Office Ltd
PO Box 276
Nine Elms Lane
London
HA
UK
Website: https://www.gov.uk/government/organisations/highways-england
Email: info@highwaysengland.co.uk
Tel: 0333 202 5070