Guide to DB05
Publication Year
2009
Document Status
Withdrawn
Abstract
Provides background information to design and build procurement, including on the role of the architect and design liability. Explains the scope of the form, and why it might be selected over others. Outlines the documents that comprise the contract package, with particular emphasis on the Employer’s Requirements and Contractor’s Proposals. Addresses obligations of the contractor, programme and timing, and control of the works. Also covers payment, insurance, termination and dispute resolution.
Document History
Superseded by Guide to DB11. Supersedes the WCD98 contract, which also has an associated RIBA Publishing Guide available through The Construction Information Service.
Author
Lupton, S.
ISBN
9781859462690
Publisher Information
RIBA Publishing
RIBA Publishing produce best practice, legal, management and technical design guides for architects and other built environments professionals.
15 Bonhill Street
London
RIBAPUBS
UK
Website: www.ribabookshops.com
Email: enquiry.publishing@riba.org
Tel: +44 (0)191 244 5557