Interim Advice Notes 111/09 Managed motorways implementation guidance: hard shoulder running
Publication Year
2009
Document Status
Withdrawn
Abstract
Updated guidance for managed motorways schemes incorporating hard shoulder running, providing an overview and highlighting installation factors, economic appraisal, environmental assessment, safety considerations and legislative requirements. Also covers operational, technological and infrastructure considerations.
Document History
Interim Advice Notes (IANs) are issued by the Highways Agency from time to time. They contain specific Guidance, which shall only be used in connection with works on motorways and trunk roads in England, subject to any specific implementation instructions contained within an IAN. Whilst IANs must be read in conjunction with the Design Manual for Roads and Bridges (DMRB) and Manual of Contract Documents for Highway Works (MCHW) for the above works, and may incorporate amendments or additions to documents in these manuals, they are not part of the DMRB or MCHW. Replaces HA IAN 111/08. Read with HA IAN 139/11, "Managed motorways project safety risk work instructions"
Publisher Information
Highways Agency
The Highways Agency is now known as Highways England. The new government company is in charge of operating England's motorways and major A roads, including modernising and maintaining the highways. Their publications include the Design Manual for Roads and Bridges, the Manual of Contract Documents for Road Works and Interim Advice Notes.
Publications available from:
The Stationery Office Ltd
PO Box 276
Nine Elms Lane
London
HA
UK
Website: https://www.gov.uk/government/organisations/highways-england
Email: info@highwaysengland.co.uk
Tel: 0333 202 5070