Abstract
Appropriate for major works where the employer regularly procures large-scale construction work and the contractor to be appointed is experienced and able to take greater risk than would arise under other JCT contracts, where the parties have their own detailed procedures and where limited procedures only need be set out in the contract conditions, where the employer has prepared his requirements and provided these to the contractor; where the contractor is not only to carry out and complete the works but also to complete the design, and the employer employs a representative to exercise the powers and functions of the employer under the contract.
Document History
Current edition: MP 2016. Previous editions: MP 2005 (Revision 2 2009), MPF 2003. JCT 2011 Contracts should not be used for construction contracts entered into after 1 October 2016. See also: Amendment 1 issued March 2015 (effective from 6 April 2015): JCT major project construction contract 2011 (SMA, 2015), which has been included as a separate document. JCT 2011 has now been withdrawn following the successful release of the JCT 2016 edition of contracts, 10 May 2018.
ISBN
9780414047013
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000