Other tools NBS offers a range of tools for specification and collaboration National BIM Library The most trusted BIM Library in the UK, certified to the internationally-recognised NBS BIM Object Standard Uniclass 2015 A dynamic and unified classification system for the construction industry covering all sectors Construction Information Service (CIS) A comprehensive online collection of construction related standards, regulations, technical advice and articles Plug-ins NBS provides a range of tools to help connect your CAD model to your specification model
Platform Resources Support Events About TheNBS.com Manufacturers Uniclass 2015 Get in touch

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom
Download from CIS *
* A valid subscription to The Construction Information Service is required to download this document.

Click here to find out how to access this document

JCT Major Project Contract (MP) MPSub JCT major project sub-contract 2011 (Withdrawn)

Publication Year

2011

Document Status

Withdrawn

Abstract

Appropriate for use where the main contract is the Major Project Construction Contract, and for sub-contract works whether or not they include design by the sub-contractor. Can be used where the sub-contract works and/or main contract works are to be carried out in sections, for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete re-measurement of the sub-contract works.

Document History

Current edition: MPSub 2016. Previous editions: MPSub 05 (Revision 2 2009), Sub/MPF 2004. JCT 2011 Contracts should not be used for construction contracts entered into after 1 October 2016. See also: Amendment 1 issued March 2015 (effective from 6 April 2015): JCT major project sub-contract 2011 (SMA, 2015), which has been included as a separate document. MPSub 2011. JCT 2011 has now been withdrawn following the successful release of the JCT 2016 edition of contracts, 10 May 2018.

ISBN

9780414047020

Publisher Information

Sweet and Maxwell

Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.

100 Avenue Road
London
SMA
UK

Tel: 0207 3937000