JCT Collateral Warranties (CWa) SCWa/E JCT sub contractor collateral warranty for employer 2011 (Withdrawn)
Publication Year
2011
Document Status
Withdrawn
Abstract
May be given by a sub-contractor to an employer (‘Employer’) for proposed building works let or to be let under: a Standard Building Contract (SBC), Intermediate Building Contract (IC), Intermediate Building Contract with contractor’s design (ICD), or a Design and Build Contract (DB).
Document History
The current edition of this contract is JCT sub contractor collateral warranty for employer 2016. JCT 2011 Contracts should not be used for construction contracts entered into after 1 October 2016. Replaces - SCWa/E 05. JCT 2011 has now been withdrawn following the successful release of the JCT 2016 edition of contracts, 10 May 2018.
ISBN
9780414047105
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000