Microgeneration Certification Scheme 3006 Microgeneration installation standard: Requirements for contractors undertaking the supply, design, installation, set to work commissioning and handover of micro-hydropower systems. Issue 2.2a
Publication Year
2012
Document Status
Withdrawn
Abstract
For micro-hydropower systems with an output not exceeding 50kW electrical and are based on-shore. Covering definitions, requirements for the certified contractor, design and installation requirements, system performance, staff competence and handover.
Document History
MIS 3006. Update 2.1 issued 28 October 2010. Update 2.2 issued 03 February 2012. Update 2.2a issued 20 February 2012.
Publisher Information
Department of Energy and Climate Change
The Department brings together much of the Climate Change Group, previously housed within the Department for Environment, Food and Rural Affairs (Defra), with the Energy Group from the Department for Business, Enterprise and Regulatory Reform (BERR). From July 2016 became part of the Department for Business, Energy and Industrial Strategy (BEIS)
3 Whitehall Place
London
DECC
UK
Website: http://www.decc.gov.uk/
Email: enquiries@decc.gsi.gov.uk
Tel: 0300 060 4000