BSRIA Guide BG 38/2012 Soft landings core principles
Publication Year
2012
Document Status
Withdrawn
Abstract
A Soft Landings project is defined by following Core Principles which need to be adopted in their entirety. It is important that clients and project teams recognise the five Stages; 1: Inception and Briefing, 2: Design Development, 3: Pre-handover, 4: Initial Aftercare, and 5: Extended aftercare.
Document History
Updated and replaced by BG 38/2014.
ISBN
9780860227083
Publisher Information
BSRIA Limited
BSRIA was founded in 1956. It is a consultancy, test and research organisation which publishes technical notes and guidance for designers and specifiers of building services.
Old Bracknell Lane West
Bracknell
Berkshire
BSRIA
UK
Website: https://www.bsria.com/uk/
Email: bsria@bsria.co.uk
Tel: +44 (0)1344 465600