Click here to find out how to access this document
JCT Management Building Contract (MC) MCWC/C JCT management works contract conditions 2011 (includes New rules of measurement update - 2012) (Withdrawn)
Publication Year
2011
Document Status
Withdrawn
Abstract
Appropriate for use where the main contract is the Management Building Contract, and for sub-contract works whether or not they include design by the works contractor. Can be used where the sub-contract works and/or project are to be carried out in sections, and for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete re-measurement of the sub-contract works.
Document History
The current version of this contract is MCWC/C 2016. JCT 2011 Contracts should not be used for construction contracts entered into after 1 October 2016. Replaces - MCWC/C 05. See also: Amendment 1 issued March 2015 (effective from 6 April 2015): JCT management works contract 2011 (MCWC/A and MCWC/C) (SMA, 2015), which has been included as a separate document. JCT 2011 has now been withdrawn following the successful release of the JCT 2016 edition of contracts, 10 May 2018.
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000