JCT Intermediate Building Contract (IC) IC JCT intermediate building contract 2011 (includes New rules of measurement update - 2012) (Withdrawn)
Publication Year
2011
Document Status
Withdrawn
Abstract
For use where the building works are to be carried out in sections, by either private and local authority employees, and where provisions are required to cover named specialists.
Document History
Current edition: IC 2016. Previous editions: IC 2005 (revision 2 2009), IFC 1998. JCT 2011 Contracts should not be used for construction contracts entered into after 1 October 2016. See also: Amendment 1 issued March 2015 (effective from 6 April 2015): JCT intermediate building contract 2011 (SMA, 2015), which has been included as a separate document. JCT 2011 has now been withdrawn following the successful release of the JCT 2016 edition of contracts, 10 May 2018.
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000