Click here to find out how to access this document
BSRIA Guide BG 27/2011 Pitstopping - BSRIA's reality checking process for Soft Landings
Publication Year
2011
Document Status
Current
Abstract
Describes a process that allows construction teams to periodically reconsider critical design issues by focusing on the perspective of the end user. Pitstops may occur during any of the following construction stages: Briefing, Design, Construction, Post-construction and Initial aftercare.
Document History
This document uses the old five stages which were defined in BG 54/2014 'Soft landings framework'. It has not been updated in order to reflect the six phases which are covered in BG 54/2018 'Soft landings framework 2018. Six phases for better buildings'.
ISBN
9780860226932
Publisher Information
BSRIA Limited
BSRIA was founded in 1956. It is a consultancy, test and research organisation which publishes technical notes and guidance for designers and specifiers of building services.
Old Bracknell Lane West
Bracknell
Berkshire
BSRIA
UK
Website: https://www.bsria.com/uk/
Email: bsria@bsria.co.uk
Tel: +44 (0)1344 465600