Interim Advice Notes 173/13 Implementation of BD 97/12 The assessment of scour and other hydraulic actions at highway structures (Withdrawn)
Publication Year
2013
Document Status
Withdrawn
Abstract
For the implementation of BD 97/12 on Highways Agency structures, detailing the action required for structures already assessed to BA 74/06 and for structures not assessed to BA 74/06. Also covers periodic reassessment, other flood effects and risk management measures.
Document History
Superseded by CS 469 Management of scour and other hydraulic actions at highway structures (NHW, 2024). Interim Advice Notes (IANs) are issued by the Highways Agency from time to time. They contain specific Guidance, which shall only be used in connection with works on motorways and trunk roads in England, subject to any specific implementation instructions contained within an IAN. Whilst IANs must be read in conjunction with the Design Manual for Roads and Bridges (DMRB) and Manual of Contract Documents for Highway Works (MCHW) for the above works, and may incorporate amendments or additions to documents in these manuals, they are not part of the DMRB or MCHW. Provides supplementary information for BD 97/12 and is applicable to Highways Agency structures only.
Publisher Information
Highways Agency
The Highways Agency is now known as Highways England. The new government company is in charge of operating England's motorways and major A roads, including modernising and maintaining the highways. Their publications include the Design Manual for Roads and Bridges, the Manual of Contract Documents for Road Works and Interim Advice Notes.
Publications available from:
The Stationery Office Ltd
PO Box 276
Nine Elms Lane
London
HA
UK
Website: https://www.gov.uk/government/organisations/highways-england
Email: info@highwaysengland.co.uk
Tel: 0333 202 5070