Other tools NBS offers a range of tools for specification and collaboration National BIM Library The most trusted BIM Library in the UK, certified to the internationally-recognised NBS BIM Object Standard Uniclass 2015 A dynamic and unified classification system for the construction industry covering all sectors Construction Information Service (CIS) A comprehensive online collection of construction related standards, regulations, technical advice and articles Plug-ins NBS provides a range of tools to help connect your CAD model to your specification model
Platform Resources Support Events About TheNBS.com Manufacturers Uniclass 2015 Get in touch

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

Consultation document - Gatwick airport second runway, Heathrow airport extended northern runway and Heathrow airport north west runway

Publication Year

2014

Document Status

Withdrawn

Abstract

Seeks views on 3 options for a new runway in the south east of England, and on its assessments of these options.

Document History

No longer applicable as Airports Commission has issued its final report: Airports Commission - final report (2015). Consultation closed on 3 February 2015. Related to the following: Airports Commission - interim report (Airports Commission, 2013).

Publisher Information

Airports Commission

The Airports Commission was established by the UK Government as an independent body to investigate the efficient use of existing airport capacity and whether there is a need to expand it. The Commission closed in July 2015 after producing its final report.

6th Floor
Sanctuary Buildings
20 Great Smith Street
London
AIRC
UK

Website: www.gov.uk/government/organisations/airports-commission
Email: airports.enquiries@airports.gsi.gov.uk