JCT Intermediate Building Contract (IC) ICSub/D/A Amendment 1 issued March 2015 (effective from 6 April 2015): JCT intermediate sub-contract with sub-contractor’s design 2011 (ICSub/D/A and ICSub/D/C) (Withdrawn)
Publication Year
2015
Document Status
Withdrawn
Abstract
CDM Regulations 2015 update for the JCT intermediate sub-contract with sub-contractor’s design 2011 (ICSub/D/A and ICSub/D/C).
Document History
Current editions: ICSub/D/A and 2016 ICSub/D/C. Previous editions: ICSub/D/A 2011, ICSub/D/A 2005 (Revision 2 2009) and ICSub/D/C 2011, ICSub/D/C 2005 (Revision 2 2009). Effective from 6 April 2015. To be read with original contracts. JCT 2011 has now been withdrawn following the successful release of the JCT 2016 edition of contracts, 10 May 2018.
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000