Click here to find out how to access this document
RIBA Plan of work 2013 guide. Design management
Publication Year
2014
Document Status
Current
Abstract
Explores the complex role of the lead designer at the different stages of the 2013 Plan of Work. Focuses in particular on the introduction of Stages 0 and 7 which require information to be produced for operational/asset management purposes where once was just for construction, and the three core design stages which can present many challenges.
Document History
Although there is now a RIBA Plan of Work 2020, this document can be used as the stage structure in the RIBA Plan of Work 2020 is unchanged and this guidance covers specific detail on themes or strategies in a project.
Author
Sinclair, D.
ISBN
9781859465509
Publisher Information
RIBA Publishing
RIBA Publishing produce best practice, legal, management and technical design guides for architects and other built environments professionals.
15 Bonhill Street
London
RIBAPUBS
UK
Website: www.ribabookshops.com
Email: enquiry.publishing@riba.org
Tel: +44 (0)191 244 5557