Road construction details. Series 400 Safety fences (January 2016 update)
Publication Year
2015
Document Status
Current
Abstract
Includes typical road construction details which may be drawn into contracts through the appendices to the Specification for Road Works.
Document History
Updated in January 2016 to NRA RCD 400-5. November 2015 edition which includes withdrawal of RCD 400/2, RCD 400/3 and RCD 400/4 and amendments to RCD 400/5 and RCD/400/7. The RCD Compiled Set in its previous form has been discontinued, and has been replaced with a simple grouping of the RCDs by Series. For a complete list of all RCDs, please refer to NRA SD 02. This document is no longer available from the original publisher, therefore the status is unconfirmed.
Publisher Information
National Roads Authority
The National Roads Authority's (NRA) primary function, under the Roads Act 1993, was to secure the provision of a safe and efficient network of National roads. They were responsible for the planning and supervision of construction and maintenance, publishing the NRA DMRB and NRA MCDRW. In 2016 the NRA merged with the Railway Procurement Agency (RPA) to form a new organisation, Transport Infrastructure Ireland (TII).
St Martin's House
Waterloo Road
Dublin 4
NRA
Ireland