Click here to find out how to access this document
JCT Collateral Warranties (CWa) SCWa/E JCT sub contractor collateral warranty for employer 2016 (Withdrawn)
Publication Year
2016
Document Status
Withdrawn
Abstract
May be given by a sub-contractor to an employer for proposed building works. Can be used in conjunction with : a Standard Building Contract (SBC/Q, SBC/XQ, SBC/AQ), Intermediate Building Contract (IC), Intermediate Building Contract with contractor’s design (ICD), a Design and Build Contract (DB), or Prime Cost Building Contract (PCC).
Document History
Current edition: SCWa/E 2024. Previous edition: SCWa/E 2016, SCWa/E 2011.
ISBN
9780414054677
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000