Click here to find out how to access this document
JCT Collateral Warranties (CWa) SCWa/F JCT sub contractor collateral warranty for a funder 2016 (Withdrawn)
Publication Year
2016
Document Status
Withdrawn
Abstract
May be given by a sub-contractor to a provider of finance (‘Funder’) for proposed building works let or to be let under: a Standard Building Contract (SBC/Q, SBC/XQ, SBC/AQ), Intermediate Building Contract (IC), Intermediate Building Contract with contractor’s design (ICD), Design and Build Contract (DB), or a Prime Cost Building Contract (PCC).
Document History
Previous edition: SCWa/F 2024. Previous edition: SCWa/F 2016, SCWa/F 2011.
ISBN
9780414054684
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000