Click here to find out how to access this document
JCT Collateral Warranties (CWa) CWa/P and T Contractor collateral warranty for a purchaser or tenant 2024
Publication Year
2024
Document Status
Current
Abstract
For use where the contractor provides a purchaser or tenant of the building(s) (whole or part of) that comprise the works with a warranty. Can be used in conjunction with: a Standard Building Contract (SBC/Q, SBC/XQ, SBC/AQ), an Intermediate Building Contract (IC), an Intermediate Building Contract with contractor’s design (ICD), a Design and Build Contract (DB), or a Prime Cost Building Contract (PCC).
Document History
Current edition: CWa/P and T 2024. Previous edition: CWa/P and T 2016, CWa/P and T 2011.
Publisher Information
Sweet and Maxwell
Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.
100 Avenue Road
London
SMA
UK
Tel: 0207 3937000