Other tools NBS offers a range of tools for specification and collaboration National BIM Library The most trusted BIM Library in the UK, certified to the internationally-recognised NBS BIM Object Standard Uniclass 2015 A dynamic and unified classification system for the construction industry covering all sectors Construction Information Service (CIS) A comprehensive online collection of construction related standards, regulations, technical advice and articles Plug-ins NBS provides a range of tools to help connect your CAD model to your specification model
Platform Resources Support Events About TheNBS.com Manufacturers Uniclass 2015 Get in touch

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom
Download from CIS *
* A valid subscription to The Construction Information Service is required to download this document.

Click here to find out how to access this document

Report HC 19-IV Grenfell Tower Inquiry: Phase 2 report. Report of the public inquiry into the fire at Grenfell Tower on 14 June 2017. Volume 4. Part 6 - The refurbishment of Grenfell Tower

Publication Year

2024

Document Status

Current

Abstract

Presents the Phase 2 report from the Grenfell Tower Inquiry. The 7 volumes provide an update on circumstances since the Phase 1 reports were published, and then relate to: the series of events leading to the disaster (Volume 1); product testing and marketing (Volume 2); the Tenant Management Organisation and management of fire safety at Grenfell Tower (Volume 3); Grenfell Tower refurbishment (Volume 4); replacing the gas riser and the London Fire Brigade (Volume 5); the deceased and expert evidence (Volume 6); and the final part of the report covers the response and recovery operations, outstanding matters from the Phase 1 of the inquiry, the fire testing regime and assessing fire performance of external walls, information from other countries and the recommendations (Volume 7). The appendices provide a glossary, the terms of reference and the inquiry team.

Document History

Volume 4 of 7. Issued: September 2024. Chairman: The Rt Hon Sir Martin Moore-Bick. Presented to Parliament pursuant to section 26 of the Inquiries Act 2005 ordered by the House of Commons to be printed 4 September 2024. This report contains images and content which some may find distressing.

ISBN

9781528650809

Publisher Information

Grenfell Tower Inquiry

The Inquiry was established by the Prime Minister to investigate the circumstances leading up to and surrounding the Grenfell Tower fire on 14 June 2017. Chaired by Sir Martin Moore-Bick, the terms of reference were set following public consultation. The list of issues have been separated into two phases: Phase 1 looks at the factual narrative of the events on 14/06/2017, with the hearings taking place between 21/05/2018-12/12/2018 and a final report issued October 2019. Phase 2 covers the remaining issues, with the hearings starting early 2020 and a final report to be subsequently published.

13 Bishop's Bridge Road
London
GTI
UK

Website: www.grenfelltowerinquiry.org.uk
Email: contact@grenfelltowerinquiry.org.uk
Tel: 0800 121 4282