Click here to find out how to access this document
Report HC 19-VII Grenfell Tower Inquiry: Phase 2 report. Report of the public inquiry into the fire at Grenfell Tower on 14 June 2017. Volume 7. Part 10 - Response and recovery. Part 11 - Matters outstanding from Phase 1. Part 12 - The fire testing regime. Part 13 - International responses. Part 14 - Recommendations. Appendices
Publication Year
2024
Document Status
Current
Abstract
Presents the Phase 2 report from the Grenfell Tower Inquiry. The 7 volumes provide an update on circumstances since the Phase 1 reports were published, and then relate to: the series of events leading to the disaster (Volume 1); product testing and marketing (Volume 2); the Tenant Management Organisation and management of fire safety at Grenfell Tower (Volume 3); Grenfell Tower refurbishment (Volume 4); replacing the gas riser and the London Fire Brigade (Volume 5); the deceased and expert evidence (Volume 6); and the final part of the report covers the response and recovery operations, outstanding matters from the Phase 1 of the inquiry, the fire testing regime and assessing fire performance of external walls, information from other countries and the recommendations (Volume 7). The appendices provide a glossary, the terms of reference and the inquiry team.
Document History
Volume 7 of 7. Issued: September 2024. Chairman: The Rt Hon Sir Martin Moore-Bick. Presented to Parliament pursuant to section 26 of the Inquiries Act 2005 ordered by the House of Commons to be printed 4 September 2024. This report contains images and content which some may find distressing.
ISBN
9781528650809
Publisher Information
Grenfell Tower Inquiry
The Inquiry was established by the Prime Minister to investigate the circumstances leading up to and surrounding the Grenfell Tower fire on 14 June 2017. Chaired by Sir Martin Moore-Bick, the terms of reference were set following public consultation. The list of issues have been separated into two phases: Phase 1 looks at the factual narrative of the events on 14/06/2017, with the hearings taking place between 21/05/2018-12/12/2018 and a final report issued October 2019. Phase 2 covers the remaining issues, with the hearings starting early 2020 and a final report to be subsequently published.
13 Bishop's Bridge Road
London
GTI
UK
Website: www.grenfelltowerinquiry.org.uk
Email: contact@grenfelltowerinquiry.org.uk
Tel: 0800 121 4282