Microgeneration Certification Scheme MIS 3003 Microgeneration installation standard: Requirements for MCS contractors undertaking the supply, design, installation, set to work, commissioning and handover of micro and small wind turbine systems. Issue 3.5
Publication Year
2022
Document Status
Current
Abstract
For micro and small wind turbine microgeneration systems, with an electrical output up to 50kW, measured at a wind speed of 11.0 meters per second. They can be located on dedicated free-standing, guyed towers or building mounted, supplying permanent buildings and either linked to the electricity distribution grid or off-grid battery charging systems. Provides definitions and covers the requirements for the certified contractor, design and installation requirements, system performance, staff competence and handover. Includes an example site survey form and information about wind resources in urban areas.
Document History
Installation Standard. Supersedes Issue 3.4, 2015 previously published by DECC.
Publisher Information
MCS Service Company Ltd
The company responsible for the Microgeneration Certification Scheme.
First Floor Violet 3
Sci-Tech Daresbury
Keckwick Lane
MCSSC
UK
Website: www.mcscertified.com
Email: hello@mcscertified.com
Tel: 0333 103 8130