DMRB Volume 8 Section 4 Part 3 (TA 64/94) Traffic signs and lighting. Traffic management at roadworks. Narrow lane and tidal flow operations at road works on motorways and dual carriageway trunk roads with full width hard shoulders (See also IAN 57/04)
Publication Year
1994
Document Status
Withdrawn
Abstract
The recommendations contained in this Advice Note cover the principles, operational characteristics and layouts for narrow lane systems and tidal floor operations associated with full and partial contraflow road works schemes on 2-lane and 3-lane trunk motorways and all-purpose dual carriageway trunk roads with continuous full width (3.3 metres) hard shoulders.
Document History
DMRB 8.4.3. Design manual for roads and bridges (DMRB). To be read in conjunction with HA IAN 57/04 which supersedes the relevant guidance on the use of temporary speed limits at road works on high speed roads.
ISBN
9780115516078
Publisher Information
Highways Agency
The Highways Agency is now known as Highways England. The new government company is in charge of operating England's motorways and major A roads, including modernising and maintaining the highways. Their publications include the Design Manual for Roads and Bridges, the Manual of Contract Documents for Road Works and Interim Advice Notes.
Publications available from:
The Stationery Office Ltd
PO Box 276
Nine Elms Lane
London
HA
UK
Website: https://www.gov.uk/government/organisations/highways-england
Email: info@highwaysengland.co.uk
Tel: 0333 202 5070