Guidance Note 10 Beneficial use of installed systems before practical completion
Publication Year
1996
Document Status
Withdrawn
Abstract
Deals with issues arising from the beneficial use of installed systems before practical completion of the main contract works where not foreseen at tender stage and for which no provision is made in the contract conditions.
Publisher Information
National Joint Consultative Committee for Building
NJCC was disbanded in 1996.
18 Mansfield Street
London
NJCC
UK
Tel: 020 7580 5588