Concrete Bridge Development Group
The Concrete Bridge Development Group is an association of member companies and organisations, dedicated to the task of improving efficiency of the design, construction and maintenance of concrete bridges. They publish a range of technical guides, papers and current practice sheets based on research and group activities.
Riverside House
4 Meadows Business Park
Station Approach
Blackwater
Camberley
CBDG
UK
4 Meadows Business Park
Station Approach
Blackwater
Camberley
CBDG
UK
Documents by this publisher
Page 2 of 4
Series details | Title | Year | Status |
---|---|---|---|
Current Practice Sheet 9 | Bridge deck waterproofing | 2014 | Current |
Current Practice Sheet 10 | Controlled permeability formwork | 2006 | Withdrawn |
Current Practice Sheet 10 | Controlled permeability formwork | 2014 | Current |
Current Practice Sheet 11 | Concrete gantries (Withdrawn) | 2006 | Withdrawn |
Current Practice Sheet 12 | Permanent formwork for composite bridge decks | 2007 | Withdrawn |
Current Practice Sheet 12 | Permanent formwork for composite bridge decks | 2014 | Current |
Current Practice Sheet 13 | Incrementally launched concrete bridges | 2007 | Withdrawn |
Current Practice Sheet 13 | Incrementally launched concrete bridges | 2014 | Current |
Current Practice Sheet 14 | Jacked box underbridges using the Ropkins system | 2007 | Withdrawn |
Current Practice Sheet 14 | Jacked box underbridges using the Ropkins system | 2014 | Current |
Current Practice Sheet 15 | Precast segmental concrete bridges | 2011 | Withdrawn |
Current Practice Sheet 15 | Precast segmental concrete bridges | 2014 | Current |
Technical Note 1 | Introduction to concrete bridges | 2014 | Current |
Technical Note 2 | Concrete bridge layouts | 2014 | Current |
Technical Note 3 | Prestressing for concrete bridges | 2014 | Current |
Technical Note 4 | Concrete bridge types | 2014 | Current |
Technical Note 5 | Concrete bridge form-work and falsework | 2014 | Current |
Technical Note 6 | Construction methods - in-situ | 2014 | Current |
Technical Note 7 | Concrete bridge - Construction methods - Precast | 2014 | Current |
Technical Note 8 | Concrete bridge - Construction methods - Arches and frames | 2014 | Current |
Page 2 of 4