Other tools NBS offers a range of tools for specification and collaboration National BIM Library The most trusted BIM Library in the UK, certified to the internationally-recognised NBS BIM Object Standard Uniclass 2015 A dynamic and unified classification system for the construction industry covering all sectors Construction Information Service (CIS) A comprehensive online collection of construction related standards, regulations, technical advice and articles Plug-ins NBS provides a range of tools to help connect your CAD model to your specification model
Platform Resources Support Events About TheNBS.com Manufacturers Uniclass 2015 Get in touch

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

Department of the Environment

The Department of the Environment merged with the Department of Transport to form the Department of the Environment, Transport and the Regions. This organisation has since combined with others to form the Department for Environment, Food and Rural Affairs.

Publications available from:
The Stationery Office Ltd
PO Box 276
Nine Elms Lane
London
DOE
UK

Documents by this publisher

Page 1 of 34

Series details Title Year Status
Action for the countryside 1992 Current
Alternative development patterns: new settlements 1993 Current
Amenity reclamation of mineral workings: main report. Section 0 - Contents. (1 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 1 - Introduction. (2 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 2 - Planning procedures. (3 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 3 - Planning conditions. (4 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 4 - Factors affecting choice of amenity after-use. (5 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 5 - Physical and infrastructure requirements of alternative end uses. (6 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 6 - Multiple use. (7 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 7 - Long term management. (8 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 8 - Finance. (9 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 9 - Restoration: landform and drainage. (10 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 10 - Restoration: soil movement and storage. (11 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 11 - Restoration: soil materials and their amelioration. (12 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 12 - Aftercare: vegetation establishment. (13 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 13 - Aftercare: vegetation maintenance. (14 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 14 - Case study 1 Great Linford. (15 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 15 - Case study 2 Badgers golf course. (16 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 16 - Case study 3 Leziate Park, King's Lynn. (17 of 25) 1992 Withdrawn
Amenity reclamation of mineral workings: main report. Section 17 - Case study 4 Glyn Glas. (18 of 25) 1992 Withdrawn

Page 1 of 34