Health and Safety Executive
The Health and Safety Executive work to protect the health and safety of people in the workplace by minimising risks. They achieve this through research, information and advice, promoting training, new or revised regulations and codes of practice, inspection, investigation and enforcement.
Redgrave Court
Merton Road
Bootle
HSE
UK
Merton Road
Bootle
HSE
UK
Website: http://www.hse.gov.uk/
Documents by this publisher
Page 19 of 71
Series details | Title | Year | Status |
---|---|---|---|
Asbestos Essentials EM1 | What to do if you uncover or damage materials that may contain asbestos | 2011 | Withdrawn |
Asbestos Essentials EM2 | Training | 2006 | Withdrawn |
Asbestos Essentials EM2 | Training | 2011 | Withdrawn |
Asbestos Essentials EM3 | Building a mini-enclosure | 2006 | Withdrawn |
Asbestos Essentials EM3 | Building and dismantling a mini-enclosure | 2011 | Withdrawn |
Asbestos Essentials EM4 | Using a Class H vacuum cleaner for asbestos | 2011 | Withdrawn |
Asbestos Essentials EM4 | Using a type H vacuum cleaner for asbestos | 2006 | Withdrawn |
Asbestos Essentials EM5 | Wetting asbestos materials | 2006 | Withdrawn |
Asbestos Essentials EM5 | Wetting asbestos materials | 2011 | Withdrawn |
Asbestos Essentials EM6 | Personal protective equipment (PPE) | 2006 | Withdrawn |
Asbestos Essentials EM6 | Personal protective equipment (PPE) | 2011 | Withdrawn |
Asbestos Essentials EM7 | Using damp rags to clean surfaces of minor asbestos contamination | 2011 | Withdrawn |
Asbestos Essentials EM7 | Using rags to clean surfaces and equipment contaminated with asbestos | 2006 | Withdrawn |
Asbestos Essentials EM8 | Personal decontamination | 2006 | Withdrawn |
Asbestos Essentials EM8 | Personal decontamination | 2011 | Withdrawn |
Asbestos Essentials EM9 | Disposal of asbestos waste | 2006 | Withdrawn |
Asbestos Essentials EM9 | Disposal of asbestos waste | 2011 | Withdrawn |
Asbestos Essentials EM10 | Statement of cleanliness after textured coating removal | 2011 | Withdrawn |
Asbestos Essentials EM10 | Two-stage airlock for textured coating removal | 2006 | Withdrawn |
Asbestos Essentials EM11 | Model statement of cleanliness after textured coating removal | 2006 | Withdrawn |
Page 19 of 71