Other tools NBS offers a range of tools for specification and collaboration National BIM Library The most trusted BIM Library in the UK, certified to the internationally-recognised NBS BIM Object Standard Uniclass 2015 A dynamic and unified classification system for the construction industry covering all sectors Construction Information Service (CIS) A comprehensive online collection of construction related standards, regulations, technical advice and articles Plug-ins NBS provides a range of tools to help connect your CAD model to your specification model
Platform Resources Support Events About TheNBS.com Manufacturers Uniclass 2015 Get in touch

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

RIBA Publishing

RIBA Publishing produce best practice, legal, management and technical design guides for architects and other built environments professionals.

15 Bonhill Street
London
RIBAPUBS
UK

Documents by this publisher

Page 30 of 38

Series details Title Year Status
Form of appointment as planning supervisor (PS/99). Health and safety. The construction (design and management) regulations 1994 1999 Withdrawn
Form of appointment for interior design services (ID/05) 2005 Current
Guide to RIBA forms of appointment. 2nd edition 2004 Current
Guide to RIBA forms of appointment 1999, and other architects appointments 1999 Withdrawn
Guide to the standard form of agreement (SFA 92) for the appointment of an architect (1996 revision) 1996 Withdrawn
Historic buildings: repairs and conservation work: alternative schedule of services. (Standard form of agreement for the appointment of an architect SFA/92) 1992 Withdrawn
Memorandum of agreement for use with architect's appointment: main works 1982 Withdrawn
Memorandum of agreement for use with architect's appointment: small works 1982 Withdrawn
RIBA contract administration forms 1999 revisions: notes to users 2000 Withdrawn
Schedule of services and fees for use with architect's appointment: main works 1982 Withdrawn
Schedule of services and fees for use with architect's appointment: small works 1982 Withdrawn
Standard form of agreement for the appointment of an architect (SFA/92). Supplement to take account of the Health and Safety Construction (Design and Management) Regulations 1994. April 1995 (Superseded by SFA99) 1995 Withdrawn
Standard form of agreement for the appointment of an architect (SFA/92): design and build: contractor client version (Superseded by SFA99 and DB1/99) 1992 Withdrawn
Standard form of agreement for the appointment of an architect (SFA/92): design and build: employer client version (Superseded by SFA99 and DB2/99) 1992 Withdrawn
Standard form of agreement for the appointment of an architect (SFA/92) - RIBA edition (Superseded by SFA99) 1992 Withdrawn
RIBA Appointing Forms AMS/04 Access management services: outline plan of work for a building project 2004 Withdrawn
RIBA Appointing Forms CE/99 Conditions of engagement for the appointment of an architect (2004 update) (Replaced by the Standard agreement for the appointment of an architect (S-Con-07-A) pack) 2004 Withdrawn
RIBA Appointing Forms DB1/99 Employers requirements. Amendment DB1/99 for use on a Design and Build Contract. (RIBA forms for the appointment of an architect SFA/99 and CE/99) (superseded by the Standard agreement for the appointment of a consultant S-Con-07-C pack) 2004 Withdrawn
RIBA Appointing Forms DB2/99 Contractors proposals. Amendment DB2/99 where the client is a contractor (RIBA form of agreement for the appointment of an architect SFA/99) (Replaced by Supplementary schedule for contractor's design services (SupCD-07) pack) 2004 Withdrawn
RIBA Appointing Forms PM/99 Form of appointment as project manager for a construction project (2004 update). (Superseded by the Standard agreement for the appointment of a consultant S-Con-07-C pack) 2004 Withdrawn

Page 30 of 38