Click here to find out how to access this document
Defect Action Sheet 73 Suspended timber ground floor: remedying dampness due to inadequate ventilation
Publication Year
1986
Document Status
Current
Abstract
Intended to remind and inform designers and site supervisory staff of ways of avoiding some of the most troublesome defects which have beset Local Authority housing. This Defect Action Sheet covers suspended timber ground floor: remedying dampness due to inadequate ventilation. Failures discussed include rot in joists, wall plates and floor boards. Defects discussed include insufficient or obstructed air bricks; and cross-flow ventilation obstructed.
Document History
Defect Action Sheets may no longer represent current best practice. Any of this information and guidance must be considered alongside other current professional advice provided by suitably qualified personnel.
Publisher Information
BRE
BRE is a building science centre that generates new knowledge through research. This is used to create products, tools and standards that drive positive change across the built environment. BRE helps its government and private sector clients meet the significant environmental, social and economic challenges they face in delivering homes, buildings and communities. BRE is owned by the BRE Trust, a registered charity. The Trust uses the profits made by the BRE companies to fund research and education that advances knowledge of the built environment.
IHS BRE Press
The Capitol Building
Bracknell
BRE
UK