Click here to find out how to access this document
Defect Action Sheet 114 Slated and tiled pitched roofs: flashings and cavity trays for step and stagger layouts - specification
Publication Year
1988
Document Status
Current
Abstract
Intended to remind and inform designers and site supervisory staff of ways of avoiding some of the most troublesome defects which have beset Local Authority housing. This Defect Action Sheet covers slated and tiled pitched roofs: flashings and cavity trays for step and stagger layouts - specification. Failures discussed include rain penetration into a separating wall. Defects discussed include cavity trays, soakers or flashings omitted, incorrectly formed or positions.
Document History
Defect Action Sheets may no longer represent current best practice. Any of this information and guidance must be considered alongside other current professional advice provided by suitably qualified personnel.
Publisher Information
BRE
BRE is a building science centre that generates new knowledge through research. This is used to create products, tools and standards that drive positive change across the built environment. BRE helps its government and private sector clients meet the significant environmental, social and economic challenges they face in delivering homes, buildings and communities. BRE is owned by the BRE Trust, a registered charity. The Trust uses the profits made by the BRE companies to fund research and education that advances knowledge of the built environment.
IHS BRE Press
The Capitol Building
Bracknell
BRE
UK