Construction Papers 4 Liquidated and ascertained damages
Publication Year
1992
Document Status
Withdrawn
Abstract
Discusses the use of liquidated and ascertained damages in the payment of a fixed sum in the event of a breach of contract covering their amount, calculation, application and defences.
Author
Hibberd, P. R.
Publisher Information
Chartered Institute of Building
With members drawn from professional disciplines within building and construction supply chains, the CIOB is a body of knowledge concerning the management of the total building process. Publications include technical information sheets, guides, construction papers and Construction Information Quarterly.
The Chartered Institute of Building
1 Arlington Square
Downshire Way
Bracknell
CIOB
UK
Website: http://www.ciob.org
Email: reception@ciob.org.uk
Tel: +44 (0) 1344 630700