Health Technical Memorandum 2011 Emergency electrical services. Validation and verification
Publication Year
1992
Document Status
Withdrawn
Abstract
Gives details of the requirements for ensuring that manufactured equipment is formally tested and certified as to contract and manufactured to the highest level of quality assurance. The importance of commissioning is emphasised and the order of tests on site is listed. Routine testing, which is a subset of these commissioning tests, is also reviewed.
Document History
Superseded by DOH HTM 06-01 Part A and Part B.
ISBN
9780113214099
Publisher Information
NHS Estates
NHS Estates were responsible for strategic development of a flexible and responsive environment for health and social care. Their publications included Health Technical Memorandums, Health Building Notes, design guides, circulars and Health Facilities Notes. Add - These were then transferred to the Department of Health.
Publications available from:
The Stationery Office Ltd
PO Box 276
Nine Elms Lane
London
NHS
UK
Tel: 0870 600 5522