Click here to find out how to access this document
Building Centre Trust Case Study 9 Converting from traditional draughting to 3D CAD: MacKellar Schwerdt
Publication Year
2000
Document Status
Current
Abstract
Aimed at medium-sized design practices who intend to invest in CAD as a means of improving working methods in order to provide a better service. It shows how an organisation can successfully make a significant investment in information technology after carefully considering the options and benefits. Managers of such practices will be interested in how factors other than financial justification can play an important part in the process of acquiring a CAD facility.
Document History
This document is no longer available from the original publisher, therefore the status is unconfirmed.
Author
Race, S.
ISBN
9781860813795
Publisher Information
BRE
BRE is a building science centre that generates new knowledge through research. This is used to create products, tools and standards that drive positive change across the built environment. BRE helps its government and private sector clients meet the significant environmental, social and economic challenges they face in delivering homes, buildings and communities. BRE is owned by the BRE Trust, a registered charity. The Trust uses the profits made by the BRE companies to fund research and education that advances knowledge of the built environment.
IHS BRE Press
The Capitol Building
Bracknell
BRE
UK