Good Practice Case Study 220 Long-term performance of a gas turbine combined heat and power installation. 1998 edition
Publication Year
1998
Document Status
Withdrawn
Abstract
Sets out to evaluate the long term performance and reliability of a combined heat and power (CHP) scheme at Conoco's Humber Refinery, reassessing the economics of the project, taking account of current energy prices and installation costs.
Publisher Information
Building Research Energy Conservation Support Unit
Now known as The Carbon Trust.