Low energy hospitals - Wansbeck General Hospital Ashington, Northumberland - 1st year appraisal (Archived historic document - relevant to time of production)
Publication Year
1995
Document Status
Current
Abstract
Lists the functional content and installed engineering plant and describes the various energy conservation measures and heat reclaim techniques that are used to save energy. The document reviews the performance of these measures and the whole hospital during its first year of operation and compares this with projects built to conventional standards.
Document History
Archived publications are still available but should be used in the context that practice may have moved on or new technology emerged since their production. Some of these documents may not have been superseded or replaced due to their content not being healthcare specific. Documents marked historic are relevant to the time they were produced, such as case studies and may not be updated or superseded in the future.
ISBN
9780113223442
Publisher Information
NHS Estates
NHS Estates were responsible for strategic development of a flexible and responsive environment for health and social care. Their publications included Health Technical Memorandums, Health Building Notes, design guides, circulars and Health Facilities Notes. Add - These were then transferred to the Department of Health.
Publications available from:
The Stationery Office Ltd
PO Box 276
Nine Elms Lane
London
NHS
UK
Tel: 0870 600 5522