Report 124 Long term monitoring of a reinforced earth bridge abutment at Carmarthen: 1984 to 1994
Publication Year
1994
Document Status
Current
Abstract
The Websol system was used to construct the abutments to a road bridge and a rail bridge along a section of the Carmarthen bypass (A48) built over soft alluvial deposits on the floodplain of the Afon Tywi. This report monitors the long term performance of the structure and presents and discusses data obtained from site surveys up to June 1994.
Publisher Information
Transport Research Laboratory
The Transport Research Laboratory (TRL) is an internationally recognised organisation providing research, consultancy, testing and certification for all aspects of transport.
Crowthorne House
Nine Mile Ride
Wokingham
TRL
UK
Website: http://www.trl.co.uk/
Email: enquiries@trl.co.uk
Tel: 01344 773131