Interim Advice Notes 45/02 Structures management information system (SMIS) - Phase IV, V and VI - Fixing structures defects and system integration
Publication Year
2002
Document Status
Withdrawn
Abstract
SMIS can capture inspection and inventory data at component level, assign maintenance actions, provide project management for estimation, schedules and bidding, produce benefit scores for continuous value management, track national structures programmes (NSPs), record maintenance constraints, interim measures, design inventory data and provide an interface with other information systems.
Document History
Interim Advice Notes (IANs) are issued by the Highways Agency from time to time. They contain specific Guidance, which shall only be used in connection with works on motorways and trunk roads in England, subject to any specific implementation instructions contained within an IAN. Whilst IANs must be read in conjunction with the Design Manual for Roads and Bridges (DMRB) and Manual of Contract Documents for Highway Works (MCHW) for the above works, and may incorporate amendments or additions to documents in these manuals, they are not part of the DMRB or MCHW. Refers to DMRB Volume 3 Section 1 Parts 4 and 5 (3.1.4-5) and Volume 3 Section 2 Part 1 (3.2.1). Supersedes IAN 38. Amends BD 62/94, BD 63/94 and BA 63/94. This IAN shall be implemented from 18/11/2002. Superseded by IAN 67/05.
Publisher Information
Highways Agency
The Highways Agency is now known as Highways England. The new government company is in charge of operating England's motorways and major A roads, including modernising and maintaining the highways. Their publications include the Design Manual for Roads and Bridges, the Manual of Contract Documents for Road Works and Interim Advice Notes.
Publications available from:
The Stationery Office Ltd
PO Box 276
Nine Elms Lane
London
HA
UK
Website: https://www.gov.uk/government/organisations/highways-england
Email: info@highwaysengland.co.uk
Tel: 0333 202 5070