Guidance note (MPF 2003)
Publication Year
2003
Document Status
Withdrawn
Abstract
Prepared to respond to the specific needs of those employers who have in house contractual procedures and regularly undertake major projects, and the contractors with whom they work. As a consequence, it has been possible to reduce the amount of detail within the contract conditions so that they are both shorter and simpler than the existing JCT standard form.
Document History
Should be read in conjunction with Main Project Form - contract conditions.
Publisher Information
Joint Contracts Tribunal
JCT contract documents have been published by Sweet and Maxwell (SMA) since 2005. Established in 1931, the Joint Contracts Tribunal produce standard forms of contracts, guidance notes and other standard documentation for use in the construction industry.
28 Ely Place
London
JCT
UK
Tel: +44 (0)20 7251 7100